Ready to start
Starting with all items moved away from the perimeter.
Perforated PVC Pipe
The pipe is installed within the excavated space.
Time for gravel
Gravel is laid down to fill around the pipe as necessary and 3/4 of the way up.
Finishing touches
Sentry seal is applied to complete the waterproofing.
Job completed!
Groundwork completed and restored back to level.