Wall Cracking
Wall cracking showing the structural failure

Before Work Begins
Crawl Space before we start SmartJack installation

Holes Dug in Crawl Space
Holes dug out to install SmartJacks

Stronger Crawl Space Support
Our crawl space support system can support vertical loads exceeding 60,000 pounds, which is far stronger than conventional concrete repairs.

Beams Installation
Beams are installed under flooring to support SmartJacks

Installation Process
The SmartJack® during installation

Concrete Poured
Concrete added to secure SmartJack System

Installed SmartJack System
The SmartJack® can be installed year-round, with installations completing in about a day. There's no waiting time for concrete to cure!