Trench Dug
Digging out trench to place the WaterGuard subfloor drainage system.
Sump Pump Hole Dug
The whole in the floor is excavated for the sump pump to be placed.
Weeping Holes
Weeping holes are drilled along the permitter to allow water to flow from the concrete block into the soon to be placed WaterGuard system.
Installation Process
The area is cleaned up, clean gravel is added and the WaterGuard is ready to be placed.
WaterGuard Installed
The WaterGuard is installed and the area is covered with a layer of CleanSpace.
Sump Pump Placed
The sump pump is installed and assembled.
WaterGuard Complete
The WaterGuard is installed and covered with a thin layer of cement to keep in place.
TripleSafe Installed
The TripleSafe sump pump is fully installed, drainage lines are connected and everything is cemented into place.
IceGuard and LawnScape
The IceGuard and LawnScape system are being installed. A area is dug in the yard to place the lines, then they are connected.
Project Complete
The IceGuard and LawnScape are fully installed and buried, flush with the ground. All lawn decor is put back in place, the system is almost invisible.