prep
Perping for Push Piers takes digging down to the bottom of the foundation.

Driving the piers
Piers are the hydraulically driven through the brackets to the bedrock.

Finding Bedrock
It can take many Piers to find the bedrock or a stable soil layer. once found, the Push piers can then attempt a lift.

Stabilized
Once the lift is complete the home becomes permanently stabilized in its new position.

Finished
When the Push Piers are installed the home is lifted and stabilized, the dirt will be back-filled and everything put back in place, the only thing the home owner will see is the cracks are closing and the doors and windows work better.